• Surface protective film for floor Manufacturers, Surface protective film for floor Factory, Supply Surface protective film for floor
  • Surface protective film for floor Manufacturers, Surface protective film for floor Factory, Supply Surface protective film for floor
  • Surface protective film for floor Manufacturers, Surface protective film for floor Factory, Supply Surface protective film for floor
  • Surface protective film for floor Manufacturers, Surface protective film for floor Factory, Supply Surface protective film for floor
  • Surface protective film for floor Manufacturers, Surface protective film for floor Factory, Supply Surface protective film for floor

Surface protective film for floor

Brand :Panzhu

Product origin :Dawang Village, Dacheng County, Langfang, Hebei, China (Mainland)

Delivery time :15days

Supply capacity :100000m²

The floor Surface protective film has PVC+ needle cotton and ground protection film to improve
the cushioning performance of the protective film. Pearl cotton, wall protective film, high quality
and low price. Transparent protective film has long service life and can be recycled 4-5 times.

Surface protective film

The floor protection film has OPP+ needle cotton and ground protection film to improve the cushioning 

performance of the protective film. Pearl cotton, wall protective film, high quality and low price. Transparent 

protective film has long service life and can be recycled 4-5 times.

 waterproof membrane


Suggestion:

1.Wall and floor tiles, in the case of dry paving, do not rush to hook seams, in order to avoidartificial

ceramic tile loosening, uneven, affecting the construction effect.

2.Before the ground tiles are dried and fixed, do not walk on them and pile up debris, so as not 

to cause tiles loose and uneven.

3. After laying the floor tile, use the finished protective film to cover the brick surface.

It can not only prevent the sand from wearing the floor, but also effectively prevent the paint and 

paint and other colored liquid dropping on the brick surface, causing ground pollution. As mentioned 

above, the protection of finished decoration in construction is a very meticulous work, now only a few 

relatively important aspects to be added.

  floor membrane


Surface protective film


  Delivery time:7-10 days after your prepayment.

 waterproof membrane


 floor membrane

★7*24hours service

★Reply email in 10hours

★10 production lines for short delivery time

★Welcome you to visit our factories and negotiate business with us face to face!


Factory Show

OUR COMPANY
Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
* Email :
Company :
  • Name :

  • Phone:

Message :
close left right